WIREMAN SEM-4
1.
INTRODUCTION OF TRANSFORMER
2.
IDEAL TRANSFORMER AND TRANSFORMER RATIO
3.
TYPES OF TRANSFORMER
4.
INSTRUMENT TRANSFORMER
5.
TRANSFORMER TERMS
6.
TRANSFORMER LOSSES
7.
EFFICIENCY OF TRANSFORMER
8.
PARALLEL OPERATION OF TRANSFORMER
9.
3-PHASE TRANSFORMER
10.
3-PHASE TRANSFORMER CONNECTION
11.
AUTO TRANSFORMER
12.
TRANSFORMER OIL AND ITS TESTING
13.
TRANSFORMER COOLING
14.
TAP CHANGING OF TRANSFORMER
15.
TRANSFORMER BUSHING AND TERMINATION
16.
POWER GENERATION OF THERMAL AND HYDRO POWER PLANT
17.
POWER GENERATION IN DIESEL AND NUCLEAR POWER PLANT
18.TRANSMISSION AND DISTRIBUTION
19.ELEMENTS OF DISTRIBUTION
20.I.E. RULES
21.OVERHEAD LINE ASSECCORIES
22.
SUBSTATION
23.GENERAL MAINTANANCE OF SUBSTATION
24.
BUSBAR TRUNKING SYSTEM
25.SPECIFICATION OF BUS BAR TRUNKING
26.OVERHEAD BUS BAR SYSTEM ARRENGEMENT
27.
TYPES OF DISTRIBUTION
28.CONNECTION OF HIGH VOLTAGE EQUIPMENT TO BUS BAR
29.
LINE PROTECTIVE SYSTEM AND TYPES
30.
METHODS OF PROTECTIVE SYSTEM
31.
LIGHTENING ARRESTER
32.
TYPES OF LIGHTENING ARRESTER
33.
CIRCUIT BREAKER
34.MAIN PARTS OF CIRCUIT BREAKER
35.AIR CIRCUIT BREAKER
36.VACCUM CIRCUITBREAKER
37.
OIL CIRCUIT BREAKER
38.
SF6 CIRCUIT BREAKER
39.SWITCH GEAR-1
40.SWITCH GEAR-2
41.ELECTROMEGNETIC RELAY AND THERMAL RELAY
42.
INDOOR AND OUTDOOR SUBSTATION
43.
H.T. SUBSTATION
44.
EHT SUBSTATION
45.
POLE MOUNTED SUBSTATION
46.
TYPES OF UNDERGROUND CABLE
47.
LT UNDERGROUND CABLE
48.
HT UNDERGROUND CABLE
49.
UNDERGROUND CABLE TESTING
50.
CABLE LAYING METHOD
51.
NECESSITY OF CABLE JOINT
52.
CABLE TERMINATION
53.
LT-HT CABLE JOINT
54.
NECESSITY OF SYNCHRONIZING
55.
SAFETY IN SYNCHRONIZING
56.
SYNCHRONIZING METHOD-LAMP METHOD
57.
SYNCHRONIZING METHOD-SYNCHROSCOP
58.
NEED OF CONTROL PANEL
59.
CONTROL PANEL LAYOUT
60.
CONTROL PANEL WIRING METHOD
61.CABLE COLOR CODING
62.
PREVENTIVE MAINTANANCE
63.
IMPORTANT POINTS IN PREVENTIVE MAINTENANCE
64.DOMESTIC AND INDUSTRIAL WIRING FAULTS
65.
FAULT FINDING METHODS
66.
LAY OUT PLAN AND ESTIMATION
67.
HOUSEWIRING LAYOUT AND ESTIMATION
68.INDUSTRIAL WIRING ESTIMATION
69.
HOSPITAL, BANK AND HOSTEL LAYOUT
70.
MULTI STORY BUILDING
71.
I.E. RULES FOR WIRING
No comments:
Post a Comment